Steel & Component Fabrication
Light-gauge sections are cut, framed and checked for square at the fabrication benches before anything is assembled.
Real client orders being built in our factory in China. Follow every module through steel framing, waterproofing, wall lining and pre-delivery inspection — then onto the building site in Australia.
One client order, documented stage by stage: components fabricated and modules framed in China, then installed on site in Australia.
Light-gauge sections are cut, framed and checked for square at the fabrication benches before anything is assembled.
Frames are squared, braced and set out in sequence — each module tagged to a specific client order on the batch line.
Wet-area membranes, insulation and services go in before linings — this is where leaks and callbacks are designed out.
The same order photographed after arrival in Australia — structural steel sub-floor set out and floor cassettes installed by the local build team.
Steel sub-frame levelled on site, then floor cassettes landed and fixed by the Australian build team.
Cassettes arrive tagged per module position, then are laid and fixed onto the levelled steel sub-frame.
Silent footage filmed on the factory floor and during a client inspection visit.
Floor Cassette AssemblyProduction line assembling light-gauge floor cassettes.
Client InspectionOverseas client walking the module frames before lining.
Production HallPan across the framing hall during a client order.
Finished ModuleCompleted unit with window opening, ready for services.
Footage is silent and shot on a phone during routine production. Client names, order numbers and site addresses are not shown.
We photograph and report every stage of your order. Ask us for a factory video call, a progress report, or an inspection visit.